Company news
Trade news
Site Notice
Present location: Homepage >> News center >> Site Notice
With an annual output of 500 thousand tons of dimethyl ether project environmental impact two Anhui Haoyuan Chemical Industry Group Co., the first public participation in the evaluation of the public
Author:   Source: Chief Engineer Office   Published:2015-09-07   Viewed 716 times

1 project name and overview
1.1 proposed project name
500 thousand two tons of dimethyl ether project with Anhui Haoyuan Chemical Industry Group Co. ltd.;
1.2 overview of the proposed project
Construction unit: Anhui Haoyuan Chemical Industry Group Co. ltd.;
Project nature: new;
Project construction site: Fuyang coal based new material industrial park;
Project construction content and scale: the new annual output of 500 thousand tons of dimethyl ether two device and coal gasification, purification, purification and other raw materials supporting device, while supporting the construction of auxiliary facilities, public power facilities and necessary living facilities etc..
2 project construction unit name and contact
2.1 project construction unit
Anhui Haoyuan Chemical Industry Group Co., ltd.;
2.2 contact way
If the public need to obtain the additional information of this project, please contact the Anhui Haoyuan Chemical Industry Group Co. Ltd. contact:
Contact: Mei director
Tel: 05582368799
E-mail:hyzgb@126.com
3 the name and contact way of the organization to undertake the work of environmental impact assessment
The environmental impact of the proposed project evaluation work by Anhui Tongji environmental protection science and technology limited company to undertake, contact the following:
Contact: Zhou Gong
Tel: 18056065876
E-Mail:329724623@qq.com
4 evaluation procedures and main work content
4.1 evaluation procedures
The environmental impact assessment procedures are shown in figure 1.
4.2 main work content
A detailed analysis of the engineering project, guide to the selection of recommended by the relevant model and calculation methods of the analysis, after the implementation of the project construction area of atmospheric pollutants, wastewater, solid waste and noise emissions, analysis of various pollutants is discharged, the degree and range of influence and selection of appropriate models to predict emissions of various pollutants on the environment the analysis of the project site; feasibility analysis; the feasibility of pollution prevention and control measures, finally put forward the reasonable and feasible measures for pollution prevention and control; analysis of the project is in line with the requirements of clean production; and give a clear conclusion from the perspective of environmental protection project is feasible.
5 solicit public opinions on the scope and main issues
Comments range for the proposed project site surrounding enterprises and institutions, schools and residential and other people concerned about the proposed project.
The main issues to solicit public opinion include:
(1) what do you think of the environmental quality of the current residential area?
(2) do you know about the proposed project?
(3) what are the impacts of the proposed project on the construction of the proposed project?
(4) what do you think are the environmental impacts of the proposed project operation period?
(5) what aspects do you think are the beneficial effects of the proposed project?
(6) what is your attitude towards the proposed project?
(7) what are the other recommendations and requirements for the environmental protection of the proposed project?
6 the main form of public opinion
If the public of Anhui Haoyuan chemical industry group limited two annual output of 500 thousand tons of dimethyl ether project puts forward his opinion and suggestion, please click the above contact details and Anhui Haoyuan Chemical Industry Group Co. Ltd. and Anhui Tongji environmental protection science and technology limited company contact.
7 publicity time
According to the State Environmental Protection Department released in February 14, 2006 on [2006]28, "public participation in environmental impact assessment for the first time" method, the environmental impact of the project evaluation of the publicity of public participation for 10 working days.
Anhui Haoyuan Chemical Industry Group Co., Ltd.
Anhui Tongji Environmental Protection Technology Co. Ltd.
September 7, 2015


Figure 1 evaluation procedures

 

Friendly links:
晋城媒业集团 中化新网 China Chemical Network http://www.nmtech.com.cn/ Nitrogen Fertilizer Net 中国化肥网
Copyright preserved.ANHUI HAOYUAN CHEMICAL GROUP CO., LTD.  Wan ICP registered No. 06000447 Technology supporter: Haoyuan Group Information Center
( Display resolution 1024×768 SCR & IE6.0 or its upgraded version viewer are suggested for view.)